The Marquee before the lining.



The roof sections have been pulled through the channels. The marquee is now compete as the customers wanted to see the walls of the hotel when the marquee is finished.

In the photograph you can see the lining ridge hanging from ropes attached to the ridge of the marquee. This will be lowered shortly to waist height. The centre of the lining is attached to the lining ridge along with the chandeliers. Once the lining is assembled the ridge is then hoisted up. The next step is to pull the lining out to the sides of the marquee.

The owners of the hotel (David and Simon) are constructing a dance floor using laminate flooring on top of the wood floor.







 