The roof sections have been pulled through the channels.
The marquee is now compete as the customers wanted to see
the walls of the hotel when the marquee is finished.
In the photograph you can see the lining ridge hanging
from ropes attached to the ridge of the marquee. This will
be lowered shortly to waist height. The centre of the lining
is attached to the lining ridge along with the chandeliers.
Once the lining is assembled the ridge is then hoisted up.
The next step is to pull the lining out to the sides of
the marquee.
The owners of the hotel (David and Simon) are constructing
a dance floor using laminate flooring on top of the wood
floor.
|