
As you can see although the buildings were attractive,
the site for the marquee was a little bit of a building
site. The courtyard had previously been used as a swimming
pool. When I did the site survey the pool was half full
of builders waste. Before I laid the wood floor (pictured)
the site had been levelled and covered in a thin layer
of gravel this will allow water to drain through to the
soil.